Tuesday, May 6, 2008

may 3 progress


this is the lower floor, newly framed. from the window openings down will be within the concrete barge. this view is of our bedroom.

interior view from Jack's room looking into his sister's. step up will one day be a partition to separate the two rooms.

i don't know why, but i thought this view was cool. you are in the dining room. this is where our jukebox will sit. door is to our float.

this is the entry view showing exterior cladding. stair is to our roofdeck. entrance is on the right.

Monday, April 21, 2008

Saturday, April 19, 2008

Hanging with Jack

Mr. Mischief loves his tennis ball. 





Friday, April 18, 2008

4 16 photos (interior)

view from start of living room looking back towards dining room and kitchen. warmboard is on floor (covered by ply and tarp). doorway to float on left.
photo at start of dining room (edge of kitchen island) looking towards living room corner window. door to float is in middle ground.
photo of framing at top of butt-glazed corner bay window

4 16 photos (exterior)






these photos were taken on my trip down to Perris to see the progress.

houseboat madness





Week 3
first and second floor steel framing, primed, with wall framing, rough electrical and plumbing and warmboard radiant heating in on second floor. this is their first "dry fit" and it passed with 1/16" tolerances.